“Construction of a 100 MW solar power plant in Shu, Zhambyl Region, Republic of Kazakhstan.”
The facility is connected to the grid of JSC KEGOC. The solar power plant has been commissioned.
“Construction of a 50 MW solar power plant in Sholakkorgan, Turkestan Region, Republic of Kazakhstan.”
Currently, author’s supervision is being carried out over the course of construction. The facility is being connected to the grid of JSC KEGOC. The solar power plant has been commissioned.
Construction of the “Ybyray” 50 MW wind power plant in the Kostanay District, Kostanay Region.
“Construction of a 100 MW wind power plant in Zhanatas, Zhambyl Region, Republic of Kazakhstan.”
Author’s supervision was carried out during the construction process. The facility is connected to the grid of JSC KEGOC.
The wind power plant has been commissioned.
Data Center Project at the Akshabulak field with a capacity of 50 MW.
Working Design
Construction of external power supply facilities for the beneficiation plant at the Bogutinsk tungsten deposit in Almaty Region, with a capacity of 30 MW.
Author’s supervision was carried out, and the facility has been commissioned.